A66 Northern Trans Pennine Upgrade: Archaeological Trenching
Expressions of interest are sought from suitably qualified and experienced archaeological contractors to provide advance archaeological investigation (archaeological trenching) in connection with the above contract. All works are to be undertaken in accordance with the relevant CIfA Standards and Guidance.
A provisional trenching plan has been drawn up and will be supplied to the preferred supplier (s). The provisional trenching totals 1547 trenches comprising 81,217.5 sq m or 46410 linear metres. This represents a 2.5% sample of the land within the current red line boundary for the scheme.
It is anticipated that the chosen supplier (s) will be appointed in March 2021 and commence on site in April 2021.
The contractor will be expected to supply all plant and welfare facilities; and the manpower and equipment necessary to undertake the cleaning, sampling and recording of the proposed trenches.
The contractor will be required to lay out and supervise the opening of all the proposed trenches and to supervise the backfilling and making good of the proposed trenches.
The contractor will be expected to undertake reporting on the results of the evaluation. This is to include ongoing reporting during fieldwork at weekly intervals, an interim report available within one month of completing field work at any location and a final report incorporating dating, finds and palaeo-environmental assessments within 6 weeks of completing all fieldwork.
The contractor is to be responsible for the preparation of all necessary Health and Safety documents. The contractor will be required to liaise with the Amey/Arup land access and heritage teams to arrange access to the land required for trenching.
The appointed contractor(s) will be required to fulfil the duties of Principal Contractor as defined in CDM(2015).
Lots:
Lot 1:M6 Junction 40 to Kemplay Bank Roundabout and Penrith to Temple Sowerby (Center Parcs). A provisional total of 208 trenches.
Lot 2:Temple Sowerby to Appleby and Appleby to Brough (Warcop). A provisional total of 680 trenches.
Lot 3:Bowes Bypass (A66/A67), Cross Lanes to Rokeby and Stephen Bank to Carkin Moor. A provisional total of 332 trenches.
How to Apply:
Interested parties are requested to complete the attached/linked brief questionnaire.
A minimum of three and a maximum of six Tenderers will be shortlisted from evaluated applicants and invited to submit competitive tenders, the works being divided into three lots as described above. Tenderers will be required to submit returns for all lots.
Organisation Name
AMEY OW LIMITED
Value
£800000
Contract Date
1st Apr 2021 / 1st Oct 2021